The waterproof construction of the project adopts double-sided self-adhesive waterproof membrane. Construction started in 2016, with a waterproof construction area of 50,000 square meters.
Heilongjiang-Heihe-Sunwu-County-Royal-Garden
2024-07-31
View: 41